Blue Ghost Lunar Lander

2026

Cameras and vision navigation to land on the Moon.

Concept

Under NASA’s Commercial Lunar Payload Services initiative, Firefly Aerospace contracted Space-ng to provide the vision navigation and camera subsystems for the Blue Ghost lunar lander.

As Space-ng’s software lead, I worked with systems engineers and scientists at Firefly and NASA and applied computer vision researchers at Space-ng to develop the flight software that would process live imagery of the Moon’s surface during descent to estimate the lander’s position and orientation.

Technology

Engineering challenges included developing the terrain-relative navigation and hazard detection algorithms, accurately modeling and simulating the lunar terrain and imaging pipeline, and architecting flight and ground software to be correct, robust, and performant.

More details available upon request.

Result

On March 2 2025, the Blue Ghost lunar lander successfully touched down in Mare Crisium, becoming the first commercial spacecraft to complete a soft landing on the Moon and the first successful American lunar lander since the Apollo program.

The official landing video

Imagery from low lunar orbit

Process

Outside the cleanroom

Outside the cleanroom

Mission control

Mission control

More details available upon request.